- Environment Project and Biodiversity Conservation - referral of proposed action submission PDF (5.9 MB)
- Biodiversity management plan: Rum Jungle rehabilitation project (June 2016) PDF (4.7 MB)
- Physical and geochemical characteristics of waste rock and contaminated materials, Rum Jungle (June 2016) PDF (43.0 MB)
- Waste storage facility investigations, Rum Jungle PDF (31.0 MB)
- Detailed civil works project for rehabilitation of the former Rum Jungle Mine: Potential borrow material assessment (June 2016) PDF (6.6 MB)
- Rum Jungle intersection preliminary design (June 2016) PDF (707.1 KB)
- Rum Jungle rehabilitation - Borrow pit identification geotechnical field investigation (June 2016) PDF (32.1 MB)
- Dose calculations for Rum Jungle Creek South Recreation Reserve access scenarios - Figtree short-term visits and camping PDF (383.2 KB)
- Rum Jungle Mine rehabilitation project - stage 2 detailed design - Completion criteria and framework PDF (3.5 MB)
- Flora monitoring on the revegetation trial to inform rehabilitation design for the former Rum Jungle Mine Site PDF (5.3 MB)
- Main pit backfilling concept approaches, Rum Jungle (June 2016 PDF (8.2 MB)
- Groundwater remediation strategy for the copper extraction pad area PDF (1.7 MB)
- Groundwater flow and transport model for current conditions Rum Jungle (June 2016 PDF (45.8 MB)
- Environmental performance assessment for the preferred rehabilitation strategy, Rum Jungle report (June 2016) PDF (13.5 MB)
- Rum Jungle borrow pit and haul road investigation report (May 2016) PDF (1.8 MB)
- Rum Jungle impact assessment report (June 2016) PDF (3.4 MB)
- Rum Jungle aquatic ecosystem early and late dry season 2015 report (June 2016) PDF (1.2 MB)
- Rum Jungle aquatic ecosystem survey early dry season 2014 report (June 2016) PDF (2.3 MB)
- Rum Jungle impact assessment – floodplain tailings investigation report (March 2016) PDF (11.7 MB)
Rum Jungle mine
Completed Studies
These reports relate to projects commissioned under the National Partnership Agreement on the management of the former Rum Jungle mine site, which will aid in development of an improved rehabilitation strategy for the site.
- Rum Jungle Creek South waste rock dump and additional landform material characterisation investigation (November 2015) PDF (11.2 MB)
- 2014 Hydrolgeology drilling program, old tailings dam area, Rum Jungle report (April 2015) PDF (19.9 MB)
- Threatened monitor, lizard and bat survey of the Finniss River report EcOz 2015) PDF (3.3 MB)
- Rum Jungle: Bathymetric survey - final report (07 July 2015) PDF (1.6 MB)
- Report on numerical groundwater flow modeling at the Rum Jungle Mine site - phase 3, stage 2 report PDF (20.3 MB)
- Report on surface water quality and containment load assessment for the Rum Jungle Mine site, NT - phase 3, stage 3 report PDF (11.9 MB)
- Geochemical characterisation of waste at the former Rum Jungle Mine site report PDF (17.5 MB)
- Assessment of the radiological exposure pathways at Rum Jungle Creek South (Rum Jungle Lake Reserve) report PDF (4.2 MB)
- Site evaluation: Result of soil & fluvial zone sampling & assessment PDF (17.7 MB)
- Weeds Survey of the former Rum Jungle Mine site including a 5 year management plan report PDF (870.9 KB)
- Heritage assessment of the former Rum Jungle Mine site, Northern Territory PDF (1.0 MB)
- Detailed water quality review & preliminary contaminant estimates report PDF (470.2 KB)
Print all pages in this section
Last updated: 11 November 2016
Share this page: